ONGOING PROJECTS

14TH REGIONAL DIRECTORATE OF HIGHWAYS

KARACABEY - SUSURLUK - BALIKESIR (BALIKESIR ENVIRONMENT INCLUDED) - BIGADIC-DY VE (BANDIRMA - KARACABEY) AYR- (SUSURLUK - M.KEMALPASA) AYR KM: 0 + 000-34 + 685 BETWEEN EARTH WORKS, ART STRUCTURES, BUCK (BITUMEN HOT MIXTURE) WORKS IN MISCELLANEOUS CUTTINGS

ABOUT PROJECT

DATE OF CONTRACT

01.11.2016

TERMINATION DATE

31.12.2020

COST OF THE PROJECT

25.855.260,81 USD

LOCATION OF THE PROJECT